Nancrossa Solar Farm

Only with the second attempt the Cornwall Council Planning Committee could be convinced for the planned 5.8 MW solar PV farm. The Team of ENERGISTO and its project development partner Solar Renewable Projects ltd. have countered the first refusal of the solar power plant with a precise follow-up re the visual implementation of the solar PV farm into the landscape. In summer 2015 planning consent had been achieved. Realisation and commercialisation phase could start. ENERGISTO has supported the project until commissioning.

5.9 MW
Anlagengröße
Operation
Status

Projektdetails

Cornwall, UK
Region
2014—2016
Zeitraum
Ground Mounted
Anlagenart
approx. 9.8 ha
Anlagenfläche
approx. 5.4 Mio. kWh/a
»Neue Energie«
approx. 1,640
Haushalte
approx. 3,100 t/a
CO₂

Team

Stefan Albrecht
Project Engineering
Clément Delhoume
Projekt Engineering (Grid connection)
Christoph Prenosil
2D/3D-Project Visualisation, Project Support (LVIA)

for the local community

  • fixed payment fort the support of local sports clubs

for the environment

  • A special planting will be done for increasing the biodiversity
  • The deer fencing around the solar installation will have a 15cm gap at the bottom for small manmals to roam freely

 

In cooperation with Solar Renewable Projects ltd. we act in the areas of Project Planning / Management and Engineering.